Clogged nozzles shown during
inspection with a Dry Deluge Test

December 10, 2013

A thorough Dry Deluge Test was done in the Dutch North Sea at a gas platform with carbon steel deluge piping. Many nozzles were clogged and in our report all clogged nozzles are marked on the Isometric. The operator’s maintenance department will clean out the clogged nozzles and piping.